Site-work Included erosion controls, clearing, demolition, grading, dirt remediation, storm, sewer, and fire and water systems.

  • Exported 5,500 CY of excess dirt and topsoil. Graded site to required elevation and specification.

  • Storm Drainage System: Installed 1,771 CF of storm pipe ranging in size 18" to 36".

  • Sanitary Sewer Line Installation: Installed 850 CF of sewer pipe ranging in size 6" to 8". This project included two 1,500 gallon oil/water separators with two reclaim tanks.

  • Fire Line Installation: Installed 320 LF of fire protection lines, with sizes ranging from 8" to 12". The fire system included 12" TAP, a fire vault with a double detection check valve, a PIV (Post Indicator Valve), and a FOC (Fire Dept. Connection).

  • Water System Installation: Installed 860 Lf of domestic pipe ranging from 2" to 3" including 2" RPZ and 1" BFP.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page