Public Storage - Atlanta, GA

Site-work, including crushing of old building pad, to make way for a new self- storage building.

  • Roof Drainage System Installation: We installed 700 LF of 8-inch HDPE piping to ensure efficient roof drainage, protecting the structure and surrounding area from water accumulation.

  • Storm Drainage Installation: Our team installed 814 LF of storm drain pipe to manage runoff and prevent flooding, ensuring proper water flow throughout the site.

  • Water Quality Unit Installation: We installed one Barracuda water quality unit to enhance stormwater treatment, effectively removing contaminants and ensuring compliance with environmental regulations.

  • Underground Detention System Installation: We installed an ADS MC7200 underground detention system, consisting of 34 chambers, to manage and control stormwater runoff, reducing the risk of flooding and maintaining site sustainability.

  • Sanitary Sewer Installation: We laid 586 LF of sanitary sewer pipe to provide a reliable and efficient wastewater management system for the project.

  • Grease Trap Installation: We installed one 1,000-gallon grease trap to manage waste from food-related operations, ensuring proper treatment and compliance with environmental and health regulations.

  • Pump Station Installation: Our team installed one 48" x 144" duplex fiberglass pump station, complete with two Barns pumps, to provide reliable pumping capabilities for wastewater and stormwater management.

Project Gallery

OFFICE

120 Riverside Dr SW, Cartersville, GA 30120

Hours:

Monday through Friday

8am-5pm

INQUIRIES

For any inquiries, questions or commendations:

Call: (770) 606-9555

Email: Enda@cumminsenterprises.com

  • LinkedIn
  • Instagram
  • Facebook
excavator

© 2025 by Cummins Enterprises Inc. All rights reserved.

bottom of page