top of page

Nalley Lexus - Smyrna, Ga

Demolition, site prep, and grading for a new 3-story parking deck



  • INSTALL 87 LF. OF STORM PIPE, RANGING FROM SIZE 12” HDPE TO 18" CLASS III RCP.

  • INSTALLATION OF A 52 CHAMBER ADS UNDERGROUND DETENTION SYSTEM. 

  • INSTALL 380 LF. OF SEWER LINE WITH ONE  1500 GALLON GREASE TRAP.

  • INSTALL 480 LF. OF DOMESTIC WATER LINE, RANGING FROM SIZE 4” TO 8”.

  • INSTALL 320 LF. OF 8” FIRE WATER LINE.

Project Gallery

bottom of page